This famous London skyscraper required a new more energy-efficient booster set. One which met the building’s current demand more cost-effectively.
The existing booster set had started to show several points of failure along with the customer’s concern that the system had multiple points of single failure. If left unrectified, the water supply for the whole building would have stopped.
The installation was further complicated by restricted access and restricted available downtime.
Dura Pump attended the site to assess and recommended the following installation:
Alongside the new fit-out, our engineers also removed the old pump system and equipment and wrapped lagging on the newly installed pipework.
An added challenge to this project was that our engineers had to assemble the system off site for testing, dismantle it due to restricted access and then re-assemble it again once on site. The final connection was conducted out of hours to avoid disruption to the operating of the building.
The new variable speed booster set now successfully delivers:
Impressively, we managed to deliver this project within the constraints of the current power supply which the customer was pleased about as this resulted in a huge saving on their part.