Brewing Success for Multinational Production Facility
A hospital required a critical booster set upgrade, without any disruption to the vital water supply.
READ ARTICLE
A hospital required a critical booster set upgrade, without any disruption to the vital water supply.
A hospital required a critical booster set upgrade, without any disruption to the vital water supply.
Our customer, a large teaching hospital in London required new pumps for their hot water system. The old, fixed speed belt driven pumps were inefficient and reaching the end of their life.
A hospital required a critical booster set upgrade, without any disruption to the vital water supply.
A very large site comprising of 26 pump stations, in varying sizes from large twin pump stations sets, to medium size single pump stations.